Quick answer: Ez accounts for how air is distributed to the breathing zone. The relationship used in this guide is Voz = Vbz / Ez. For example, Vbz=80 L/s with an applicable Ez=0.8 gives Voz=100 L/s. Do not select Ez from the equipment label alone: check supply and return positions, heating or cooling mode and operating conditions together.
1. What does Ez represent?
Zone air-distribution effectiveness describes how supply air reaches the breathing zone and removes contaminants. Under the ASHRAE 62.1 Ventilation Rate Procedure, Ez converts breathing-zone outdoor airflow into zone outdoor airflow:
Ez=1.0 represents conditions close to the assumed mixing reference. Below 1.0, more outdoor air is needed for the same breathing-zone requirement; above 1.0, distribution may be more effective. Select from actual supply/return locations, heating/cooling mode and temperature difference, not a system label alone.
2. Breathing-zone outdoor airflow
Rp is outdoor flow per person; Pz is design population; Ra is flow per floor area; Az is net occupiable area. Select Rp and Ra for the occupancy and adopted edition. Counting only fixed seats can underestimate meeting-room, classroom or multipurpose-space demand.
3. Worked example
Assume an illustrative 100 m² office with 20 people, Rp=2.5 L/s-person and Ra=0.3 L/s-m². These are educational inputs, not project criteria; verify the adopted occupancy table.
| Ez | Calculation | Voz |
|---|---|---|
| 0.8 | 80/0.8 | 100 L/s |
| 1.0 | 80/1.0 | 80 L/s |
| 1.2 | 80/1.2 | 66.7 L/s |
Where Ez=0.8 is applicable, demand is 25% greater than with 1.0. Copying Vbz directly into the equipment schedule would provide 80 rather than the required 100 L/s.
4. Why supply and return locations matter
Cool ceiling supply jets can entrain room air and promote mixing. Warm ceiling supply is buoyant and may remain near the ceiling; a ceiling return can short-circuit it before it reaches occupants.
Displacement ventilation supplies cool air at low level and low momentum; thermal plumes carry contaminants upwards. Appropriate design can benefit the breathing zone, but excessive momentum, incorrect temperature or blocked outlets can disrupt stratification.
5. Heating and cooling behave differently
A layout that mixes well in summer may perform poorly in winter. Check supply-to-room temperature difference, throw and terminal velocity, direction and mounting height, return/extract location, room height, obstructions, heat sources and minimum variable-flow operation.
Justify Ez at critical part-load and minimum-flow conditions as well as design flow.
6. Short circuits and dead zones
Direct supply-to-return flow can leave the breathing zone poorly renewed even when the unit delivers substantial outdoor air. Furniture, high partitions, deep rooms and unsuitable linear diffusers can create stagnant areas.
Do not measure total flow alone when investigating. Smoke visualisation, velocity and temperature mapping, CO₂ trends and, where appropriate, tracer-gas testing can reveal distribution behaviour.
7. Does CO₂ measurement establish Ez?
CO₂ is useful for occupancy-related contamination but does not alone establish all indoor air quality or Ez. Sensor position, calibration, outdoor concentration, occupancy and mixing affect readings. A sensor beside a diffuser or door may not represent the occupied zone.
Demand-controlled ventilation must address the area component, sensor failure, schedules and actual occupancy scenarios.
8. The next step for multizone systems
Do not simply add zone Voz values and call the result the AHU outdoor-air requirement. Multizone recirculating systems need primary outdoor-air fraction, zone ventilation efficiency and system efficiency assessment. One critical zone can raise the required system fraction significantly.
Zone calculations begin the AHU calculation chain. Include VAV minimums, fan flow, reset and demand control in the same analysis.
9. Design checklist
Verify occupancy and population; document Rp, Ra, Ez and edition; check heating/cooling separately; verify minimum-flow throw; assess short-circuiting and furniture/ceiling obstacles; check VAV minimum against ventilation need; provide measurable/balanceable outdoor flow; locate representative sensors; and compare commissioning results with calculations.
10. Site verification
TAB confirms terminal flow, but correct quantity does not prove correct distribution. Observe direction, throw, stratification and return paths in critical rooms at high load and minimum VAV flow.
Before changing layouts, verify sensors, dampers, filters, fan pressure and terminal flow. Increasing outdoor air arbitrarily can waste energy without resolving the distribution problem.
11. Common mistakes
Automatically assigning Ez=1.0; assuming identical seasonal behaviour; omitting either people or area components; underestimating occupancy; ignoring minimum-flow throw; overlooking short-circuits; treating one CO₂ sensor as conclusive; confusing zone and system outdoor air; changing furniture after distribution design; and omitting measured outdoor fraction from balancing reports.
12. Separate outdoor air from total supply
A 1,000 m³/h terminal with a verified 20% outdoor fraction supplies 200 m³/h of outdoor air, not 1,000. Verify mixing, leakage and distribution. Exhaust is a separate requirement; neighbouring-room extraction does not automatically satisfy office breathing-zone demand. Assess transfer-air origin and contaminants.
For an illustrative Vbz=180 m³/h, Ez=1.0 gives Voz=180 m³/h and Ez=0.8 gives 225 m³/h. Ez is tied to defined distribution conditions, not a freely chosen design preference. Verify assumptions from the adopted table. This is a zone calculation; multizone selection follows separately.
13. Diffuser selection requires more than size and flow
Review mounting height, throw, drop, spread, supply temperature and sound together. Read the terminal velocity and test conditions underlying catalogue throw. An isothermal plot does not prove all-season behaviour. Warm air trapped high up can leave occupants under-served; a cold jet over desks can cause discomfort despite adequate ventilation.
| Symptom | Possible cause | Check |
|---|---|---|
| Warm upper zone | Stratification | Temperatures at different heights |
| Desk draught | Jet in occupied zone | Velocity, direction and supply temperature |
| Fresh air near return only | Short circuit | Supply/return arrangement |
| Stale corners | Dead zone or inadequate flow | Local measurements and layout |
Assess type, direction, number and location rather than increasing fan speed automatically. Include final furniture and partitions. Dividing an open office into rooms changes distribution; retaining the old total flow does not preserve adequacy.
14. Ventilation at VAV minimum flow
Cooling load may fall while population stays constant. For 180 m³/h required outdoor air and 600 m³/h minimum supply, the simple required fraction is 30%. At 20%, only 120 m³/h arrives. This illustrates minimum-operation risk, not a replacement for multizone efficiency calculation.
A CO₂ sensor alone does not establish adequate control. Define area demand, other contaminants, calibration, minimum limits and failure behaviour. Test different occupancy and fan modes.
Record terminal flow, AHU outdoor flow and temperatures in the same mode rather than combining measurements from different days. Consider instrument uncertainty and measurement effects; use specification tolerances. Complaint records should include time, occupancy, doors and control mode. Technical reference: https://handbook.ashrae.org/Handbooks/A23/SI/a23_ch58/a23_ch58_si.aspx
15. Sources and scope
- ANSI/ASHRAE Standard 62.1-2025, Ventilation and Acceptable Indoor Air Quality.
- Standards information: https://www.ashrae.org/technical-resources/bookstore/standards-62-1-62-2
- Purposes and scopes: https://www.ashrae.org/technical-resources/standards-and-guidelines/titles-purposes-and-scopes
- Read-only access: https://www.ashrae.org/technical-resources/standards-and-guidelines/read-only-versions-of-ashrae-standards
ASHRAE lists the 2025 edition, but a project may adopt another edition through contract, local rules or authority requirements. Verify Ez and criteria from the accepted text. This educational article does not replace an engineer's project calculation.
Frequently asked questions
How does Ez=0.8 affect outdoor airflow? For the 80 L/s breathing-zone example in this guide, 80/0.8=100 L/s, or 25% more than the Ez=1.0 calculation. This comparison does not recommend an Ez value; verify applicability using the adopted design requirements.
Can the same Ez be assumed in heating and cooling? Not automatically. Reassess supply temperature, jet behaviour, supply and return positions and minimum-flow operation.
Does one CO₂ measurement establish Ez? No. Sensor location and calibration, outdoor concentration, occupancy and mixing affect the reading. CO₂ trends can support an investigation but do not alone establish correct distribution or all indoor air quality conditions.